Any Question +977-9801011809
We provided comprehensive structural steel fabrication and erection services for a heavy-duty Raw Material Storage Platform. Designed to handle intense industrial loads, this structure serves as a critical component in Berger Paints’ manufacturing supply chain in Hetauda.
The Raw Material Storage Platform at the Berger Paints factory was engineered to accommodate high-density storage requirements within a demanding industrial environment. Managing a total steel weight of 200 Metric Tons, our scope included high-precision fabrication and on-site assembly of heavy structural steel members.
We focused on creating a robust, load-bearing framework that could support the daily operational stresses of a large-scale chemical manufacturing facility. The project required strict adherence to industrial safety standards and structural tolerance, ensuring the platform remains stable under heavy operational loads. Through collaborative planning with Sharma and Co., we successfully integrated the new steel structure within the existing factory layout, meeting all client specifications for safety, durability, and operational efficiency.
| Technical Property | Specification | Remarks |
|---|---|---|
| Material Grade | IS 2062 Structural Steel | High-strength carbon steel. |
| Coating System | Industrial Epoxy Primer & Enamel | Enhanced corrosion protection. |
| Structural Loads | Heavy Industrial Live Loads | Designed for maximum safety factors. |

Working with Eco Steel and Hydro on our recent commercial multi-story project was a game-changer. Their design team utilized Tekla Structures to provide millimetre-level BIM detailing and comprehensive clash detection before a single piece of steel was cut. When the fabricated components arrived from their Chitwan workshop, they were perfectly labeled ready-to-assemble kits. The CNC precision and quality of the welding meant our on-site erection time was drastically reduced. They truly understand the demands of seismic-resilient construction in Nepal.
The focus was on creating a high-capacity, load-bearing steel platform capable of supporting the heavy weight of raw material storage in an industrial factory setting.
We employed a systematic fabrication-to-erection workflow, ensuring that the 200 Metric Tons of steel were fabricated to precision and erected in stages to minimize downtime at the Berger Paints facility.
Yes, as with all our industrial projects in Nepal, the platform was engineered to meet structural safety standards, including seismic resilience for industrial environments.
We maintained close coordination with Sharma and Co. to ensure that the steel structure integrated seamlessly with the factory's existing infrastructure and construction timeline.
By using high-quality structural steel and industrial-grade protective coatings, the structure is designed for long-term durability and corrosion resistance.